Hong Kong International Airport Three Runway Systems Third Runway and Associated Works
Chek Lap Kok,
Hong Kong
With the development of the Hong Kong International Airport three-runway system, a huge amount of related work must be conducted to accommodate the renowned international aviation hub. Being such a grand scale project, numerous requirements and limitations are to be met for the wall constructions, PERI supplied various systems to accomplish the goals.
Location
Project participants
Customer: SAPR Joint Venture
The Project
Impressions from the project process
We have supplied PERI UP as the scaffolding system, which allows almost any adjustments to be made to suit local site conditions
TRIO Wall Formwork has ensured simple shuttering procedures and reduced shuttering times
PS100 Shoring System was used for the top slab of a tunnel
We have supplied PERI UP as the scaffolding system, which allows almost any adjustments to be made to suit local site conditions
TRIO Wall Formwork has ensured simple shuttering procedures and reduced shuttering times
PS100 Shoring System was used for the top slab of a tunnel