Tseung Kwan O - Lam Tin Tunnel Main Tunnel
Tseung Kwan O,
Hong Kong
PERI designed and delivered the VARIOKIT tunnel system for a mining tunnel with a pouring height of 8.2 m and a pouring length of around 11 m.
The well-designed single-sided wall formwork can be moved to the next pour by wheels conveniently.
Location
Project participants
Customer: Leighton-China State Joint Venture
The Project
Impressions from the project process
A special steel tunnel traveler was required for the cavern work.
The project adopted the VARIOKIT VTC Tunnel Carriage with its exceptional ability to concrete slab.
A special steel tunnel traveler was required for the cavern work.
The project adopted the VARIOKIT VTC Tunnel Carriage with its exceptional ability to concrete slab.