Hsin Cheng Logistic Centre
Taoyuan,
Taiwan
Hsin Cheng Logistics Centre is a newly built third-party logistics centre with a total building area of 105,785 m2. PERI assisted in constructing a 2,500 m2, 12 m-high wall to meet the project requirements, and the lightweight and extremely easy-to-operate DUO System Formwork was put into use for this project.
-
Benefits
Workers can operate without cranes.
-
Benefits
Most tasks can be performed without the use of any tools.
The Project
Hsin Cheng Logistics Centre has a total construction area of 105,785 m2. PERI provided the lightweight and extremely easy-to-use DUO System Formwork for this project.
The lightweight DUO System Formwork allows workers to operate without cranes, and most tasks can be performed without any tools. Furthermore, it is very easy to assemble, greatly improving overall efficiency and reducing construction time.
Hsin Cheng Logistics Centre has a total construction area of 105,785 m2. PERI provided the lightweight and extremely easy-to-use DUO System Formwork for this project.
The lightweight DUO System Formwork allows workers to operate without cranes, and most tasks can be performed without any tools. Furthermore, it is very easy to assemble, greatly improving overall efficiency and reducing construction time.
Project Information
Want to know how PERI can support your project?