Taoyuan International Airport Terminal 3 Energy Centre

Project data

Location: Taoyuan, Taiwan

Taoyuan International Airport is the largest airport in Taiwan, it is currently undergoing an expansion in response to the rapid growth in passenger volume and economic activities in the Asia-Pacific region.

Terminal 3 is the largest single investment following Taiwan’s 10 Major Construction Projects and the flagship among the 12 iTaiwan Construction Projects. One of PERI’s contributions is to provide shoring and formwork systems.

Requirements

  • Systems with fast assembly to meet the tight schedule
  • A flexible shoring system that provides high load-bearing capacity

Customer

/

PERI solution

  • The universal DUO system formwork could be used to form walls, columns, and slabs with no additional tools
  • PS 100 shoring system allows a fast assembly with only one type of connector